European Disaster Recovery Colocation

Keep your services running when the primary site is
offline

Launch and run a colocation based disaster recovery site in Europe without stitching together vendors, hiring
locally, or flying in engineers for every hardware issue.

award
ONE PARTNEROne company for the full setup
award
EU FACILITIESTier III & IV data centers
award
CERTIFIEDISO 27001 & PCI DSS evidence

Talk to our team

Get a tailored comparison and migration plan.

SUPERMICRO
SUPERMICRO
graid
noris
TD SYNNEX
FIQ
Cloudflare
Intel

A disaster recovery site is
not just rack space

Getting the site live is the easy part. Keeping it ready, tested, and protected is the ongoing job
nobody plans for.

—INFRASTRUCTURE

Hardware still needs
hands

Drives fail. Cables move. Diagnostics happen on site. Without a trusted operating team, small hardware tasks can lead to expensive travel, delays and risk.

—READINESS

Untested failover isn't
real failover

Setting up the site is a one-time job. Keeping failover verified after every update, change, and swap is an ongoing one.

—COMPLIANCE

Compliance docs don't write themselves

Compliance teams don't want a generic report. They want documentation tied to the specific articles of your framework, not rebuilt from scratch every six months.

The real cost rarely makes
it into the budget

Every hardware trip, supplier handoff, and documentation rebuild is a cost your team didn't
account for at the start.

Coordination cost

Time lost to coordination

Your team shouldn’t have to spend weeks aligning facility, network, hardware, and support responsibilities across separate conversations.

Senior engineering hours · Procurement cycles

Travel cost

Travel hidden inside operations

A few physical tasks a year can quickly turn into flights, delays, and senior engineering time spent away from higher-value work.

Flights · On-call disruption · Project-delivery slip

Audit cost

Documentation rebuilt too often

When evidence is scattered, every review becomes a new assembly project for IT, compliance, and risk teams.

Compliance hours · Re-collected evidence

One partner for colocation,
support, and compliance

Bring the moving parts of your disaster recovery site into one managed setup.

Icon

From facility to failover-ready 

Skip the setup entirely. Gcore selects the data center, racks the equipment, sets up connectivity, and prepares the environment for failover. The site is ready to go live and built to stay that way.

Tier III & IVEU data centers Single contract
Icon

One contract. One counterparty

Work with one counterparty and one service agreement in your working language, covering the full setup, response paths, and operational responsibilities.

One SLAIn your language
Icon

Engineers on site, under SLA

Skip the flights to colocations. Gcore engineers handle drive swaps, re-cabling, and hardware diagnostics on your equipment, on location, with response times written into the SLA.

Remote handsOn-site SLA
Icon

Stay reachable. Stay protected.

Keep the recovery site connected and defended from day one. Network services and DDoS protection are built into the setup, not added as an afterthought.

DDoS L3-7Protected workloads
Icon

Your dossier, mapped to your regulator

Get a compliance package that maps to your regulator's specific articles, not a generic template. The baseline certifications are already in place.

ISO 27001PCI DSS

FREE setup for eligible projects

Remove the last barrier to a working EU recovery site. No upfront cost getting in the way.

Plan your DR site

Network first. Not
data center first.

The space is just where the site lives. Connectivity, protection, and network reach are what make it work when you need it.

210+

Edge PoPs worldwide

200 Tbps

DDoS filtering capacity

5 EU regions

for site placement

0PoPs

in sanctioned countries

Documentation

Documents that survive the audit.
Not just the setup.

Most documentation packages are generic. This one is built around your setup, your regulator, and your team's actual review process.

Contracts, acceptance acts, and compliance dossiers can be prepared in Ukrainian and English.
Inside the package
// Pre-kickoff

Master service agreement & SLA

Signed before any equipment is racked. One counterparty across facility, network, and on-site work, with response times and operational commitments in writing.

// Kickoff

Operating responsibilities & escalation map

Who owns what across facility, network, hardware operations, and incident response. Named escalation paths agreed before the build starts.

// Build

Facility & Tier rating attestations

Partner-facility evidence, Tier rating documentation, and physical-security posture for the site you're deploying into. Reviewable by your audit team.

// Acceptance

Acceptance acts (facility / hardware / connectivity)

Signed handover for each layer once it's racked, connected, and tested. Each layer has its own act so auditors can trace exactly what was accepted, when.

// Go-live

Failover plan & test record templates

Setup, expected behaviors, test record templates, and review cadence. Ready for the first failover test, not assembled afterward.

// On request

Regulator-mapped dossier

Where applicable, mapped to the articles that apply to your jurisdiction.

Your disaster recovery site. Live and ready.

No surprises on timeline, cost, or who owns what.

ONBOARDING TIME

2 months

From kickoff to failover-ready

Most sites are live within six months. Complex setups get a written plan with firm dates before we start.

NO TRAVEL NEEDED

0 flights

Your team stays home

Gcore engineers handle all on-site work. Drive swaps, re-cabling, diagnostics. All under SLA.

WE ARE HERE
1:1

Dedicated engineer

A named Gcore engineer owns your setup end-to-end. No ticket queues. 
Just a direct line when you need it.

Built for real infrastructure pressure

Real disaster recovery isn't a document.
It's infrastructure that runs so smoothly, your board never needs to know it exists..

Company logo

Microsoft

Software and cloud services

"We needed a provider that could deliver enterprise-grade performance at global scale. The right partner needed proven infrastructure across all major regions and the technical capability to integrate seamlessly with our existing architecture."
Author avatar

Joey Etzier

Principal Technical Program Manager CDN

210+global PoPs activated
4regions covered
Read case study →
Company logo

Company Name

Industry / description

A compelling testimonial quote that speaks to the value provided.
Author avatar

Author Name

Job Title, Company

40%Performance improvement
Faster deployment
Read case study →

Ready to stop running disaster recovery alone?

Tell us about your location, workload, deadline, and documentation needs. We will map the facility, connectivity, operations, and SLA path with you.

In your call we cover:
  • Which EU facility fits your recovery path
  • What Gcore handles on site, under SLA
  • How the compliance dossier maps to your regulator
  • Your deployment timeline and go-live plan
  • Failover testing and what "ready" actually means
  • Which certifications apply to your setup